A DIFFERENT ANGLE

Flat & low-slope roofing

A low-slope roof needs its own assembly and scope, rather than a shingle formula.

Example EPDM membrane roof; not a TPO product photo or a Fine Element project
Photo by KVDP · Public domain. Resized WebP and display crop. Material example, not a Fine Element project. EPDM example; not a TPO product image.

Put the base rate in context.

Fine Element base rates · reviewed November 10, 2026
MaterialBase rate / sq ft
TPO membrane$5.499
PVC membrane$5.265
Torch-down / modified bitumen$4.095

Measured section area × its base rate, plus one $2,000 disposal allowance per project. Each roof section is counted once.

Damaged plywood is $100 per 4 × 8 ft sheet after inspection; no quantity is assumed. Tax, permits, flashing, underlayment and other scope are not represented as included.

See the estimator’s costs and assumptions →

Focus on the complete assembly

Ask about the membrane, insulation, attachment, penetrations and drainage details. Those decisions belong in the proposal.

Choose the right assessment

TPO, PVC and modified bitumen are distinct options in the estimator. A professional should confirm which system fits each roof section and the intended work. EPDM and unusual assemblies need a separately defined scope and price.

Count each roof section once

A home may combine pitched and low-slope sections. The estimator treats these sections separately and uses TPO provisionally for low-slope sections when a pitched material is selected. The inspector must verify the areas, transitions and final material choice.

Start with your own roof.

Review your options, then verify the details at a free inspection.

Get My Free Estimate